Air Force

Col. Boyd’s OODA Loop and the Future of the Navy

Categories

Tags

No Tags

JohnBoyd_PilotColonel John Boyd (USAF) developed a decision cycle concept called the OODA (Observe, Orient, Decide and Act) Loop. He applied the concept at the strategic level in military operations, but it can also be applied to our current and future warfighting efforts, what we design, build, budget for, and use in pursuit of our national objectives – today and in the future. If we consider Col. Boyd’s concept in relation to those warfighting efforts, then today we must begrudgingly admit that our adversary’s decision cycle operates more quickly than our own OODA Loop. Technology, particularly use of information technology systems (including the internet), has moved so quickly the past few decades that our enemies can design, steal or borrow new ideas for weapons or equipment, share information and quickly move out well in advance of our ability to counter those ideas. Yet we remain mired in the same processes used to design, build, budget and produce those items our military needs, more or less unchanged, since the 1960s.

Today to provide the warfighter a new weapon, ship, or airplane, we begin inside a bureaucratic process that requires an analysis of the gaps, alternatives, various capability documents, review upon review by a number of well-meaning organizations, etc… That is just to come to an agreement on what must go out to industry for their ideas, proposals and estimates. Items must be competed – sometimes even when it is already known what company can build to the need quickest and at the best price. And then there’s the funding question.

Creating a finished budget literally takes two years or more. Once the decision is made that we need to buy item X at price Y, it has to be put into the Department’s Budget. It takes almost a year for a service to build a budget, allow senior leaders the opportunity to review, debate and determine priority, and ultimately, decide if an item should be funded or not. Then begins the process of defending the service’s priorities starting inside the Pentagon and ending on Capitol Hill a year (or so) later. If approved inside the National Defense Authorization, and Defense Appropriation Acts (it is worth noting that today, a non-decisional Continuing Resolution is the norm), then we can finally spend money on a contract for a new warfighting capability. In summary, if we decide we need to produce a new, non-complex weapon, it takes a minimum of three or four years to actually deliver that weapon to the field.

We have begun to change – small but necessary steps, are being made. There is an Urgent Operational Needs process that allows the warfighter to quickly request a new capability, if the request meets certain policy criteria. A group of senior decision makers meets every two weeks to ensure urgent warfighter needs are being met as quickly as possible. They work together to push through the bureaucracy, even working outside the Department of Defense – with the Department of State and leadership on Capitol Hill. There have been successes. However, at the same time we make these small but important steps towards flexibility, we continue to struggle with new policy constraints or modifications to current requirements in existing systems.

If we are to remain the preeminent military force in the world we must continue to change. We must build a process that results in capability fielded quickly, vice capability fielded much slower – with minimal risk. Rather than have a series of consecutive leadership reviews on proposals (and the capability and/or funding required), each of which takes many months and can only move forward to the next step sequentially after each leader approves, we need to have single meetings of the right leaders to take in information, ask questions and make decisions – in a timely manner. We need the ability to spend money on new efforts today – not two years from now after we’ve built a budget, reviewed and defended it against any one of hundreds of reviewers who might disagree. We need flexibility to change programs as they move forward – when they hit a snag we must be able to quickly modify our plans, or if required – terminate our efforts and re-allocate the monies towards other needs. Naysayers will say a new process with speed in mind will lead to waste. The reality is that without a new process with speed in mind, we will fall further behind our growing number of challengers.

Do not misunderstand this to be a criticism of those that run or are involved in these current processes. Everyday there are tens of thousands of great Americans that work towards building the best and most capable Navy of the future. They toil under policies and laws currently in place and they do outstanding work. But we have to change the way we are doing the Navy’s business if we hope to continue to be the best. We have to tighten our own OODA Loop to decide and act far more quickly so that the enemy can’t get inside it, cannot work around it – or use our own process against us. Bottom line – we must change.

Back To Top