Operationalizing Optimized Fleet Response Plan – SITREP #1

Categories

Tags

No Tags

For more than 200 years the U.S. Navy has been integral to the security and prosperity of the United States, evolving to meet the security and maritime needs of America. The Optimized Fleet Response Plan (OFRP) grew out of recognition that after 14 years of sustained combat operations for our deployed units, the resultant trends in maintenance and modernization execution, training time compression, deployment length increases and personnel churn were unsustainable. OFRP is designed to optimize a series of processes to generate a maximum amount of operational availability of our naval forces in order to deliver rotational forces; accomplish maintenance and modernization to achieve the service life of our platforms, and be able to surge forces. All of this must be accomplished while maintaining our normal operational tempo – in short “we have to reset in stride.” In order to meet that goal, OFRP creates a framework for predictable deployment cycles with aligned and stabilized manning, stable and predictable maintenance plans, and ready forces fully trained to the high-end level of the warfighting spectrum. This is no small challenge given our Navy’s global presence requirements, resource constraints, and force size. Meeting these challenges, today and in the future, mandates we optimize the processes of our supply-based readiness model by implementing OFRP.

CSG Alignment

The previous force generation model, the Fleet Response Plan (FRP), needed adjusting in order to more efficiently deliver ready forces for deployment; achieve the life-expectancy of our platforms and provide a more sustainable surge capability. The Optimized Fleet Response Plan provides the needed change to maximize readiness by aligning staffs, ships, and air wings to Carrier Strike Groups (CSG) and Amphibious Ready Group (ARG) at the beginning of a 36-month cycle. A key distinction in the OFRP instruction is the delineation of Carrier Strike Group Commanders and Amphibious Ready Group Commanders as the Supported Commanders. Previously, TYPE Commanders (TYCOMS) moved units through the Maintenance and Basic Phases of the training and readiness cycle, with a notional hand-off to the CSG Commander when the ships entered the Integrated Phase and began operating as a Carrier Strike Group. Today within the OFRP framework, all of the ships are brought under the CSG commander at the beginning of FRTP. According to Russ Williams, USFF Deputy Director for Fleet Training and the OFRP Cross-functional Team lead, this means that “The CSG, ARGS, and TYCOMS work together to ensure the readiness of that Strike Group given where they are in the OFRP phase.”

USS Dwight D. Eisenhower operationsUSS Dwight D. Eisenhower (CVN-69) and the Eisenhower Carrier Strike Group is the first aircraft carrier and Strike Group to implement OFRP, having entered into the first cycle of OFRP last fall, and initiating the Navy’s new strategy for force generation. The Ike CSG and all of its assigned units have been a complete team throughout the maintenance phase and into the basic and integrated phases of OFRP. As they prepare to deploy mid-2016, Ike CSG’s progress through OFRP reveals the benefits of the plan and what can be improved upon.

Maintenance and Modernization

One of the goals of a maintenance and modernization process is to achieve on time and on cost execution of the schedule. OFRP is designed to help stabilize and synchronize the execution of the maintenance and modernization of our fleet in order to achieve these two goals. The stabilization and synchronization leads to other benefits than predictability. Secretary of the Navy, Ray Mabus said to the House Armed Services Readiness Committee on Sept. 10, 2015, that he was confident the Navy is taking the right steps to get maintenance on track. “We’re going to be in a position to get the life span of the ships that you’d expect out of those ships when they enter the fleet.” This is in large part due to the Optimized Fleet Response Plan. Russ Williams stated that with OFRP maintainers are given more time to “dive into the planning phase of maintenance.” With more time to plan the maintainers ensure the efficiency of the phase. It appears OFRP sets up CSGs going through the process to achieve these goals, yet with all new processes there are some issues to work on. What makes OFRP different than previous force generation models is that it takes into account the Navy being a learning organization, and therefore fosters an environment of innovation for problem solving. “World events will cause changes to the production plan – if somebody’s maintenance gets extended beyond our ability to absorb it within the shock absorber that’s built into OFRP, we would have to adjust accordingly and modify the schedules,” Rear Admiral Jeffrey Harley told the House Armed Services Readiness Subcommittee. Issues in the maintenance phase faced by Ike CSG lead to four of the seven Ike CSG deployers experiencing unexpected delays. Russ Williams noted that the “industrial base simply cannot support eight or nine surface combatants going into maintenance at the same time and coming out at exactly the same time, but that isn’t the goal of OFRP, it isn’t designed to be that rigid.” This sort of issue highlights the importance of OFRP’s flexible yet disciplined approach to force generation. Each of these late deliveries created issues in the Basic Phase of Training that had secondary negative effects leading into the Integrated Phase of training. Meeting the issue head on, the Casualty Report to Certification Crosswalk (C3) process was developed to minimize the impact of the unexpected delays. This now helps ships identify, prioritize and facilitate maintenance solutions that enable the ships to complete their certification events on time, first pass. Russ Williams notes “It was never the OFRP intent to get everybody out of maintenance at the same time. It was an OFRP construct to get everybody to begin the Integrated Phase at the same time.” Mr. Williams went on to say that OFRP enables backlog to be rectified within the cycle. The OFRP process has led to some incremental material improvements within Ike CSG, yet Maintenance and Modernization remains a critical Line of Effort (LOE) that requires continued attention by naval leadership in order to ensure the Strike Group assets all enter the Integrated Phase on schedule.

Manning and Individual Training

USS Dwight D. Eisenhower operationsHistorically, ships have struggled to achieved their manning goals early in the pre-deployment work up, often receiving new Sailors “just in time” before the deployment, or prior to composite training unit exercise (C2X), the Integrated Phase capstone training event. This resulted in numerous x- deck personnel transfers, which sub-optimized the deploying unit’s readiness, hurt the manning of the ship remaining at home, and eroded the morale of the force. Sea-centric manning policies under OFRP prioritize personnel requirements to ensure forces are ready to deploy on schedule with the right Sailors in place fully trained. This policy mandates units be manned to 92% fit, 95% fill and at threshold for all critical naval enlisted classification code (NECs) by the target Manning Date, or “M-Date,” which is the start of Basic Phase or 12-months prior to deployment (if Basic phase starts earlier than that). This allows the necessary time for shipboard teams to form, train together, and build a cohesive warfighting team prior to deploying. It is because of this OFRP protocol that Ike CSG has seen the greatest improvement in the manning and individual training LOE. With deploying Sailors onboard earlier, OFRP ships in the Ike CSG were able to better manage their school requirements and ensure individuals received the training they needed prior to both the Basic and Integrated Phases. Additionally, direct support Sailors were assigned no later than nine months before deployment (D-9) which further enhanced the integration of off-ship personnel into the warfighting team. As a result, Strike Group warfighting syndicates were able to start developing during the Maintenance Phase, leading to early engagement and increased tactical training opportunities across the Strike Group. Having the right Sailors at the right time provides a more stable and predictable organization and ultimately leads to greater unit cohesion, experience, and development of the critical warfighting skills needed for deployment.

Training

A “side effect” of previous manning practices was that many times units may not be as well-trained as they could be. OFRP ensures forces are trained with the right capabilities and trained to a single, high-end standard. Unit level training during the Basic Phase is the critical foundation toward maximizing Strike Group combat effectiveness and efficiency. Optimizing the basic phase helps by giving time to identify and overcome possible shortfalls. For example, issues during the Maintenance Phase led to a compressed Basic Phase schedules for four of seven Ike CSG deploying ships. In order to lessen the impacts of these delays, the Maintenance-Operations Float Process was employed as part of a cross functional working group to identify risks to the mission – deploying on time and fully trained. This process leveraged the expanded relationships of all the stakeholders to mitigate the identified risks. For instance, both USS Monterey (CG-61) and USS Nitze (DDG-94), both a part of Ike CSG, conducted combined sea trials to regain time within their Basic Phase schedules. Additionally, through early engagement and collaboration with Afloat Training Group (ATG), CSG-4, and Naval Surface and Mine Warfighting Development Center (NSMWDC), Ike CSG developed a group sail schedule. The schedule included Basic Phase events, and moved previous unit-level events that were historically conducted in C2X, forward into the Basic Phase, and added new Surface Warfare Advanced Tactical Training (SWATT) events early in the Integrated Phase. This collaborative effort will have allowed the entire Strike Group to get to C2X on time, fully prepared to train to the high-end level of tactical warfare.

160204-N-QD363-122In order to maximize the benefits of optimizing the basic phase Ike CSG utilized information technology and subject matter experts to help units meet their goals. Ike CSG used a Schedule Synchronization Tool (Integrated WEBSked), which is available to all stakeholders as required by USFF/CPF Instruction 3000.15A, and a Command Monitor/Mentor Process that together identifies areas where staff subject matter experts can provide assistance to individual units prior to ATG inspections or certification events. Implementation of this program has had an immediate impact on Strike Group units. Two ships, the USS Mason (DDG-87) and USS Stout (DDG-55), within Ike CSG, have completed the Basic Phase and according to ATG Atlantic, both of these ships performed above fleet average, which is attributed to the implementation of our Optimized Fleet Response Plan protocols.

Ike CSG was in the Integrated Phase of OFRP (as of the time of publishing this article), and there were some successes due to innovative measures to cope with early challenges brought about mostly by disaggregated ops being conducted within the FRTP cycle. For example, USS Oscar Austin (DDG-79) returned from a seven-month deployment during which she superbly executed national level tasking. Rejoining the Strike Group’s schedule, she met every Joint Fleet Maintenance Manual milestone, including her CNO Maintenance Availability. USS Porter (DDG-78) transferred to Sixth Fleet two weeks earlier than scheduled after completing a Joint Warrior exercise with British and NATO allies. She completed her first BMD patrol and did very well in her first maintenance availability overseas. USS McFaul (DDG-74) deployed with 91% FIT/97% FILL /1 in manning and no active C-2 CASREPs. She finished her Fifth Fleet deployment and escorted USS George Washington (CVN-73) through SOUTHCOM area of operations. These successes continue to show that OFRP allows for adaptation in order to ensure forces are ready to deploy with the right capabilities and trained to a high standard.

FRP Length

World events and our previous demand-based force generation model put stress upon Sailors and their families with long deployments, deferred and unpredictable ship maintenance schedules and unpredictable pre-deployment schedules. Chief of Navy Personnel, Vice Adm Moran said “We need to make sure we attract and retain the best people,” and he believes that the predictability and stability afforded by the Optimized Fleet Response Plan will help increase retention. OFRP provides stability and predictability, thus relieving stress and lessening uncertainty, to our Sailors and their families. Ike CSG has been scheduled for a seven-month deployment since entering OFRP. Despite 23 months of collective maintenance delays across the Strike Group, the scheduled deployment date has not shifted. The flexibility afforded by OFRP across the Strike Group has allowed the Ike CSG to absorb the maintenance delays and training schedule changes, while still tracking to the initial deployment date, fully trained to the high-end level of tactical warfare, creating a more predictable schedule for Sailors and their families.

Summary

At the outset, Navy leadership was clear that fully implementing OFRP across the Fleet would take time. As the first Strike Group to enter and execute the early cycles of OFRP, Ike CSG is laying the foundation for significant improvements throughout the entire process. The lessons learned have enabled the improvement of manning and training within the scope of the Strike Group; however, there is still work to be done in the maintenance and modernization LOE. While the performance in the Basic Phase continues well above average, the ultimate measures of effectiveness will be deployed performance. The Ike CSG goal is clear: to tactically outperform the Theodore and Harry S. Truman CSGs during the demanding and rigorous pre-deployment training and throughout deployment, and to have the Bush CSG outperform us. As a premier learning organization, only then will it be known if OFRP has been operationalized at the tactical level.